How Residential Rooftop Solar Installation Works: From Survey to Net-Meter

Viha Solar Engineering Team•Published: 2024-10-28•Updated: 2024-11-06
Quick Answer / Key Takeaway:

Installing residential rooftop solar takes 3 to 5 weeks from initial site assessment to net-meter commissioning. The process involves: 1) Shadow-free roof survey, 2) Technical feasibility application on the national portal, 3) Mechanical structure mounting and electrical wiring (takes 1–2 days on site), 4) MSEDCL inspection, and 5) Bidirectional meter installation and grid synchronization.

Stage 1: Engineering Roof Survey

Engineers assess compass orientation (optimal South azimuth), parapet shadows, roof load-bearing capacity, and electrical panel routing.

Stage 2: Portal Registration & Technical Approval

Your application is submitted to the National Portal and MSEDCL. DISCOM verifies distribution transformer capacity to approve grid interconnection.

Stage 3: On-Site Mechanical & Electrical Execution

Mounting structures are fastened, modules clamped with calibrated torque wrenches, inverters wall-mounted, and chemical earthing pits dug.

Stage 4: DISCOM Inspection & Net-Meter Charging

MSEDCL engineers verify anti-islanding safety features, test earthing resistance, install the bidirectional meter, and commission the plant.